Log in to Webshots

Login
Get Adobe Flash player

Connect with Facebook to Continue

Hello, facebook user. logout

You are signed in to your Facebook account. Share this photo by posting it on your wall, or by choosing a friend below and posting it on their wall. (one friend at a time)

Album Info:

The Glass Bridge Construction of the Skywalk began March of 2004 and is estimated to be completed by 4th quarter of 2006. Glass Bridge will be suspended 4,000 feet above the Colorado River on the very edge of the Grand Canyon. On May 2005, the final test was conducted and the structure passed engineering requirements by 400 percent, enabling it to withstand the weight of 71 fully loaded Boeing 747 airplanes (more that 71 million pounds). >> >>The bridge will be able to sustain winds in excess of 100 miles per hour >>from 8 different directions, as well as an 8.0 magnitude earthquake within >>50 miles. More than one million pounds of steel will go into the >>construction of the Grand Canyon Skywalk.

Sample Email

Below is what we'll send to your friends to invite them - edit or remove the optional note.

1 comment

Newest First | Oldest First

To be able to leave a comment please Log in or Sign up.

All Photos
  • All Photos
  • Member Photos
  • Professional Photos
  • Premium only
  • Entertainment
  • Family
  • Good Times
  • Home & Garden
  • News
  • Outdoors
  • Pets
  • Rides
  • Sports
  • Travel
  • Member Search
  • Advanced Search